01

Design phase: reserve space and intent

Identify rooms needing darkness, solar control, privacy, or grouped automation. If recessed pockets, drapery tracks, or concealed fascia are desired, coordinate their dimensions with an actual treatment concept—not an assumed generic detail.

02

Framing and electrical: create infrastructure

Add suitable blocking where needed and plan power pathways, supply locations, controls, and service access for hardwired shades. The shade provider, builder, electrician, and automation team should agree on responsibilities before drywall.

03

Finish phase: measure what was built

Final measurement should reflect installed windows, trim, tile, counters, hardware, and finished conditions relevant to the mount. Paint and trim sequencing must allow secure installation without exposing new treatments to avoidable dust or damage.

04

Move-in: bridge privacy carefully

Custom ordering and fabrication require lead time that varies by product and project. Temporary paper shades or other non-damaging coverage can address immediate privacy, but should not interfere with final measurement or mounting. Prioritize bedrooms and street-facing rooms if installation is phased.

Decision table

Compare the practical tradeoffs.

StageWindow-treatment actionAvoid
DesignChoose goals, pockets, and control conceptSizing recesses without a system
Framing/electricalCoordinate blocking, power, and service accessClosing walls before decisions
Trim/finishField measure actual openingsOrdering solely from plan dimensions
Final cleanInstall and commissionExposing fabrics to heavy construction dust

Plan infrastructure early, measure finished reality, and install when the room is clean enough to protect the product.