New construction · Lewes, DE

Planning window treatments for a new Lewes home.

For a new Lewes home, decide motorized openings and power before drywall, plan coastal-ready materials for baths and porches, and order from final measurements once openings are finished.

Clean shade installation in a new home

Local context

Why Lewes is different.

The Lewes area has seen many new communities; buyers often have a window of time during construction to make the right decisions.

How we approach it

Three common situations.

01

Before drywall

Prewire tall windows and wide doors; add blocking.

02

Before move-in

Plan temporary privacy for bedrooms and baths.

03

After move-in

Refine glare solutions once you see the light.

Compare with

Options side by side.

OptionBest forWatch for
PrewireGreat roomsCost before decisions
PocketsConcealed rollersFraming coordination
Phased ordersBudget controlTemporary privacy

Frequently asked

A few useful answers.

When should I start?+

Before drywall if motorization is possible.

Can you measure from plans?+

For budgeting; order from field measurements.

Which materials suit coastal baths?+

Composite and synthetic materials.

Private, in-person guidance

Book a Lewes design consultation.

Request a consultation